Located in Getafe, this logistics complex consists of three warehouses with a combined built area of more than 85,000 m² on a site exceeding 131,000 m². Designed for high-performance logistics operations, the project includes more than 100 loading bays and meets demanding certifications such as LEED Platinum.
Logistics complex
Logistics complex in Madrid (Spain)
The challenge
This was a large-scale project with significant technical requirements:
- Equipping more than 100 loading bays with a consistent solution
- Coordinating installation across multiple buildings within a defined schedule
- Integrating loading systems, safety equipment and signalling
- Meeting strict efficiency and sustainability standards
The solution
Inkema supplied the loading bay equipment and associated systems, including:
- 103 BOX dock levellers with hinged lip
- 103 dock shelters
- 87 sectional dock doors, plus 20 additional units
- 103 safety and signalling systems (traffic lights and SADV systems)
- 103 pairs of steel dock buffers
The solution was designed using a modular and repeatable approach, facilitating execution across a high-volume project.
The result
The complex now benefits from a loading infrastructure designed to support intensive and coordinated operations across multiple warehouses, delivering:
- High operational capacity
- Enhanced safety at every loading bay
- Efficient logistics flows
- A consistent and scalable installation
In large-scale projects such as this, coordination and standardised solutions are essential to ensuring operational efficiency.
If you are developing or upgrading a logistics facility and require loading bay equipment, industrial access solutions or safety systems, our team can help you define and implement the most suitable solution for your operation.